Sunday, June 3, 2012

Updates Objective 1 Group Discussion during Workshop ICT in Construction; The Powerful of BIM Capabilities

Objective 1 :
To discuss the form of strategy, policy and procedures for the development of ICT in FM in Malaysia
Group A;

Currently lack of a FM system on handover, hence lacking in strategy to have a FM System in place on handover to serve life cycle of the building, this should be promoted. In order to have a more proactive policy, there should be a BIM as-built model in user-friendly format
Policy: Mandatory to incorporate BIM as your design platform in terms of requirement for planning permission.
Strategy: Have in place incentives for adopting BIM, e.g. Extra points for GBI rating.
Procedures: Adopt ISO service provision standards. 

Group B;
1.  Strategy, policy and procedures

JKR is open to implementing BIM
·         initial exposure/experience.
Pilot Project
·         Launched 1 project (National Cancer Institute- NCI)
·         5 standard school building and Clinic (Health Centre)
Using ICT as control & monitoring the project
·       SCALA – system laporan projek
·       Linked to EPU
·       Integration of database
·       Embarking on E-Perunding (have implemented 3-6 months ago)

     BMS – Building management system
·        Monitoring Internal condition of building
·        Client engage
·        Design & install
·        Example : Hospital Pantai, Ampang
·        Other clients : UTHM (multipurpose hall), Sime Darby & Putrajaya
EPU must impose mandatory BIM by 2016( another 5 years)

Group C;

 
-          No ICT policy in FM in the company currently
-       There is ICT policy in organization but no specific policy for ICT in FM.
-       We are lacking of ICT policy in the organization.
-       Incorporate current 3D design with FM elements.
-       Embedded in asset management
-       Developing the capability of authority for decision making in FM requirements.
-       Develop an automation tools to check compliance of design by local authority.

Group D;
 
¢BIM ownership should be owned by FM organisation . ICT/BIM  has to be at strategic level because the involvement is throughout of life cycle of a building: starting from the design stage until demolition.
¢in house/ Outsource – outsource has advantage because technology development is too fast
¢BIM integrate the software  throughout the life cycle of building
¢BIM is a component of FM
¢FM has role to advise in the design stage
¢To implement, it need to has the policies. (e.g.: JKR/CIDB take lead) 
 
Group E;
 
Issues
  • FM in Malaysia is still in beginning stage
  • Industry reluctant to invest in ICT
  • Failure on 5 pilot project –(contractor reluctant to invest in ICT)
 
  • JKR form a community (FM) – is currently developing a guideline and system (target 2013 will implement BIM for government project)

Strategy
  • Go phase by phase from government and big player in industry
  • A study on the readiness of industry to move forwards towards ICT in FM should be conducted before policy is mandate
  • Need to have policy (mandatory) first by government, the people will start to follow Eg: for new government project, the contractor should apply at least 50% BIM
  • Private & government agencies also should have the policy in their organisation to implement ICT in FM
  • Strategy to develop people expertise on IT especially for BIM (certification)
  • Promotion and Roadshow (create awareness)
  • Incentive like tax relief, funding for  private to use BIM in FM
  • Standardisation
  • Better outsourcing ICT in FM, because high risk especially for small company
  • University should collaborate with Industry for more practical syllabus (like university attach with CISCO)
  • Encourage ICT at initial stage like from primary school
  • R&D allocation
  • Put it into games (attract people)
 
 
 
 